Switch Plate Assembly complete with Polycarbonate cover frame and powder coated steel plate with (i) ON/OFF Switch - 04 Nos, (ii) 3 pin Socket, 6A, 250V AC - 02 Nos, (iii) Glass fuse 2 Amps of M/s Ferraz Shawmut / Cooper Bussmann / Equivalent (with fuse holder) - 02 Nos. The switch plate assembly shall be in the following order with inscription as 110V, CS, L, NL, 110 V as per ICF/EDML-006 Rev-B, Drawing No.ICF/SK3-7-4-011, Alt C, Item No.2, or latest.
Published
Mon, 21 Sept
4:42 pm
Bid submission closes
Tue, 13 Oct
2:30 pm· 15 days left
Bid opening
Tue, 13 Oct
2:30 pm
Tender details
- Organisation
- Ministry of Railways
- Location
- Central Government
- Tender ID
- 107191036
- Reference no.
- 42261348
- Category
- Machinery & Equipment
- Source portal
- CPPP — Central Public Procurement Portal
How to bid
- 1Open CPPP — Central Public Procurement Portal and search for Tender ID 107191036 under Active Tenders (or Tenders by Organisation).
- 2Download the tender documents and any corrigenda. Check eligibility, EMD and the document fee.
- 3Register on the portal as a bidder with a Class 3 Digital Signature Certificate (DSC), then upload your bid before the closing time.
More from Ministry of Railways
All their tenders →- Ferrous Scrap Bin as per specification
Ministry of Railways · Central Govt
Mon, 28 Sept10:30 am · 42 min left
- MFT_Sur_(PH NO.:63003) Adhesive Plaster Non Extensile Tape Woven 2.5 X 5 Mtrs
Ministry of Railways · Central Govt
Mon, 28 Sept10:30 am · 42 min left
- Compound Bitumen (Plastic)
Ministry of Railways · Central Govt
Mon, 28 Sept10:30 am · 42 min left
- Protection Cover for Drain Cock
Ministry of Railways · Central Govt
Mon, 28 Sept10:30 am · 42 min left
- Toilet Indication light for LHB AC coac
Ministry of Railways · Central Govt
Mon, 28 Sept10:30 am · 42 min left
Similar live tenders
Machinery & Equipment in Central Govt →- Switch plate assembly complete with polycarbonate cover frame
Ministry of Railways · Central Govt
Tue, 29 Sept11:30 am · Tomorrow
- Switch plate assembly complete with polycarbonate cover frame
Ministry of Railways · Central Govt
Thu, 15 Oct11:30 am · 17 days left
- Switch Plate Assembly complete with polycarbonate cover frame
Ministry of Railways · Central Govt
Wed, 30 Sept2:25 pm · 2 days left
Mon, 28 Sept2:30 pm · Today
Tue, 6 Oct6:00 pm · 8 days left
- Switch plate assembly complete with poly
Ministry of Railways · Central Govt
Wed, 30 Sept2:30 pm · 2 days left