Extension of running room for 50 beds in new building campus at New Katni Junction under Assistant Divisional Engineer (Maintenance) Katni sub division
Published
Thu, 24 Sept
4:16 pm
Bid submission closes
Fri, 23 Oct
3:00 pm· 25 days left
Bid opening
Fri, 23 Oct
3:00 pm
Tender details
- Organisation
- Ministry of Railways
- Location
- Central Government
- Tender ID
- 92277185
- Reference no.
- DRWM-JBP-190-2026
- Category
- Civil Works
- Source portal
- CPPP — Central Public Procurement Portal
How to bid
- 1Open CPPP — Central Public Procurement Portal and search for Tender ID 92277185 under Active Tenders (or Tenders by Organisation).
- 2Download the tender documents and any corrigenda. Check eligibility, EMD and the document fee.
- 3Register on the portal as a bidder with a Class 3 Digital Signature Certificate (DSC), then upload your bid before the closing time.
More from Ministry of Railways
All their tenders →- Supply, installation and commissioning of Lobby TSS equipment set for CMS (KIOSK)
Ministry of Railways · Central Govt
Tue, 29 Sept10:30 am · Tomorrow
- Electronic Auto drain valve
Ministry of Railways · Central Govt
Tue, 29 Sept10:30 am · Tomorrow
- Supply Installation Commissioning of Visual Display Unit (65 Inch LED) for Monitroring of cleaning Activities as Per Attached Specification
Ministry of Railways · Central Govt
Tue, 29 Sept10:30 am · Tomorrow
- 4 CORE 50 SQ MM PVC insulated heat resistant electrical cable
Ministry of Railways · Central Govt
Tue, 29 Sept10:30 am · Tomorrow
- Earthing shunt for WAG-9 loco
Ministry of Railways · Central Govt
Tue, 29 Sept10:30 am · Tomorrow
Similar live tenders
Civil Works in Central Govt →- Extension/Renovation of Running Room at BRKA for 40 Nos. Beds (20 Double bed room).
Ministry of Railways · Central Govt
Fri, 9 Oct12:00 pm · 11 days left
- Patratu:- Extension of Running Room at PTRU for 40 Nos. Beds (20 Double bed room).
Ministry of Railways · Central Govt
Fri, 9 Oct12:00 pm · 11 days left
- Badnera(BD)-Construction of new running room building having 200 beds along with all amenities. (Project ID-01.01.64.25.2.50.002)
Ministry of Railways · Central Govt
Tue, 29 Sept3:00 pm · Tomorrow
- Guntakal Division - SW-(I) :Nandaluru: Construction of New Running Room (50 beds) with all facilities. SW-(II):Nandaluru: :Construction of Crew Lobby office with all facilities.SW-(III): Construction of RPF outpost building at Rajampeta.
Ministry of Railways · Central Govt
Mon, 12 Oct3:00 pm · 14 days left
- Hubballi Division-Proposed construction of additional Running Room at Castlerock (CLR)(24 rooms/48 Beds). (Maintenance Period 03 Years).
Ministry of Railways · Central Govt
Fri, 16 Oct11:00 am · 18 days left
Wed, 7 Oct3:00 pm · 9 days left