Catalogue No. : 16700506001 Supply, Erection and Commissioning of Flame Scanner System for CPP Boiler
Published
Thu, 10 Sept
11:12 am
Bid submission closes
Thu, 8 Oct
9:00 am· 10 days left
Tender details
- Organisation
- Ministry of Power › THERMAL POWER
- Location
- Central Government
- Tender ID
- GEM/2026/B/8018633
- Category
- IT & Electronics
- Quantity
- 3
- Source portal
- GeM — Government e-Marketplace
Bid document
How to bid
- 1Read the bid document on this page: the terms, eligibility, EMD, specifications and ATC (additional terms and conditions).
- 2Log in to your GeM seller account (register at gem.gov.in if you don't have one; it's free).
- 3Search BidPlus for bid number GEM/2026/B/8018633 and submit your offer before the closing time.
More from Thermal Power
All their tenders →- Analog Transceiver - Handheld
Thermal Power · Central Govt
Tue, 29 Sept9:00 am · Tomorrow
- Convective SH panels for two CPP boilers.
Thermal Power · Central Govt
Tue, 29 Sept11:00 am · Tomorrow
- Cat. No. 73181000800 1000 KVA, 6.6KV / 440V Dry type Transformer, as per IS: 11171
Thermal Power · Central Govt
Wed, 30 Sept9:00 am · 2 days left
- Hi- Chrome cast grinding media balls. Nominal Size: ? 40 mm, Hi- Chrome cast grinding media balls.
Thermal Power · Central Govt
Wed, 30 Sept11:00 am · 2 days left
Sat, 3 Oct11:00 am · 5 days left
Similar live tenders
IT & Electronics in Central Govt →- Removal of technological waste from Boiler furnace seal area, CPP dry ash Silo system area including compressor and panel room, seal air blower room and Air compressor room of CPP Boiler
Bokaro Power Supply Company (P) Limited · Central Govt
Thu, 22 Oct9:00 am · 24 days left
- Removal of technological waste from Boiler furnace seal area, CPP dry ash Silo system area including compressor and panel room, seal air blower room and Air compressor room of CPP Boiler
Bokaro Power Supply Company (P) Limited · Central Govt
Thu, 22 Oct9:00 am · 24 days left
- Design, Supply, Erection and Commissioning of Oil fired Steam Boiler
Department of Defence Production · Central Govt
Sat, 3 Oct3:00 pm · 5 days left
- Design, Engineering, supply, erection, testing and commissioning for the performance improvement and modification of boiler to mitigate high SH and RH spray of unit 1and 2 (2x600 MW), KaTPP, RVUNL, Jhalawar
Rrvun - CMD · Rajasthan
Wed, 4 Nov11:00 am · 37 days left
- Complete flame scanner guide assy, Vanned Diffuser assy. along with guide pipe, Vanned Diffuser assy. along wi
Energy and Petro Chemicals Department Gujarat · Gujarat
Wed, 30 Sept3:00 pm · 2 days left
- CPP Boiler SPIESS valve Non-integral MOV, Charges for I/T/C
Bharat Petroleum Corporation Ltd · Central Govt
Tue, 29 Sept3:00 pm · Tomorrow